   Ongoing and Upcoming

   Projects For 2008-2009

     Scroll down to see pictures of construction.

 

McNeese State University, Synthertic Turf Football Game Field. (Lake Charles, LA)

Univeristy of Louisiana Lafeyette , Synthetic Turf Football Game Field (Lafeyette, LA)

Northwestern Louisiana State University, Reconstruction and Turf Replacement of game field (Nachitoches, LA)

Lake Travis ISD, Synthetic Turf Football Game Field (Lake Travis, TX)

Austin ISD,(3 Fields, Spring of 2006-2008) 1 yr. Burger Stadium, 2 yr. Nelson Stadium, 3 yr. House Park (Austin, TX)

Van ISD, Synthetic Turf and Track Project ( Van, TX)

Laredo ISD, Multipurpose Intermural Field Synthetic Turf ( Laredo, TX)

Crane ISD, Synthetic Turf and Track Project (Crane, TX)

Eanes ISD,  2 Synthetic Turf Practic Fields, Returfing of Astro Turf Game field (Austin, TX)

Bastrop ISD, New Synthetic Turf Game Field and 400 Meter Track (Bastrop, TX)

Schertz-Cibolo ISD,  2 Synthetic Turf Game Fields (Shertz, TX)

St. Phillips College, New Multi-Plex Tennis Facility.(San Antonio, TX)

Texarkana ISD, Reconstruction of 400 meter Track (Texarkana, TX)

Rogers Public Schools, New Synthetic Turf Football Field and 2 Indoor Practice Facilities(Rogers, AR)

Edinburg ISD, Synthetic Turf Football/Soccer Field. (Edinburg, TX)

Sulpher Springs ISD, Construction of new 400 Meter Track. (Sulpher Springs, TX)

Texas City ISD, Synthetic Turf Game Field (Texas City, TX)

Dripping Springs ISD, Synthetic Turf Game Field (Dripping Springs, TX)

Liberty Hill ISD, New Tennis Court Complex (Liberty Hill, TX)

Midland Christian Schools, Synthetic Turf Football Game Field (Midland, TX)

 

Hope to see your School on our list soon!!

 

Sharyland ISD, Mission, TX.

Field Prior to any work starting. April 2006                                    Work is started by demolition of track and track base.

Track being demolished and hauled off.                                              Grass and top soil are removed and salvaged to Owner.

Rough grade is completed on field and track subgrade.                        New utilities are trenched and installed

More utility trenching is completed.

 

Greenwood Public Schools, Greenwood, AR.

Demolition is started on the South end of the field, top soil and grass are stripped and will be hauled off.

Extra soil is removed to bring field to proper subgrade, then feild is leveled to rough grade and crown of field.

Subgrade is completed and ready to start trenching.                          D-zone drainage is trenched is south End Zone.

                      

Perimeter drain trench is dug down both sides of field.                         South D-zone curb retaining wall is formed.

 

 

 